Saraji Mine long term tailings management system and infrastructure
This consisted of pipe route establishment, pipeline supply and installation, haul road crossings with environmental risk management facilities, along with return water infrastructure such as pump installation and commissioning, polyethylene safety access pontoons to ensure safe access to pumping infrastructure over bodies of water.
 
Saraji CHPP Reagent management facility
Supply and installation or the Saraji CHPP Reagent management facility, this included installation of all tanks, piping and instrumentation, including underground installation through to the CHPP fine coal circuits. This high risk area project was completed to all relevant compliance standards.
 
Ware house Facility
Poly Protective Coating carried out the supply and construction of a fully functional ware house facility.
 
water treatment plant upgrade
Poly Protective Coatings carried out a full water treatment plant upgrade which included a 4.5 km ring main throughout the entire mine site infrastructure area replacing thirty year old systems, these projects were carried out on time and on budget without incident by using the risk management process.
 
Pipe Line for Pit dewatering Facilities
Century mine project consisted 9 km of 450 HDPE pipe line for pit dewatering facilities
 
Set up, installation and commission of pit water project at Saraji
Set up, installation and commission of pit water project at Saraji, this project included launching and location of pontoons, pipe manifolds and pipe line distribution to the CHPP and various other water out lets and truck fill points, this sytem also included the supply and installation of ultra filtration for water application to fine coal filter belts and flocculation plants.
 
Factory Fabrication
control stations for CHPP operations fabricated at the PPC factory on Boundary road Paget
 